Compliance Dashboard
Tracking observed reality against project expectations.
Expectation vs. Reality
| Asset Requirement (Expectation) | Claimed Reality (Uploaded) | Status |
|---|
Active Findings
0Remediation loops for missing and non-conforming data.
Project Setup
Who this project is, and when it is due. The handover date is what gives every expectation a delivery date.
Project header
What this changes
Setting a handover date dates the ledger. Until there is one, expectations are tracked but nothing can be reported as late — a deadline nobody agreed is not a deadline.
Data Exchange Map (EXC)
Define what data is owed, by whom, and when across the project lifecycle.
Expectations
| Exchange | Artifact Owed | Responsible Party | Delivery Phase | Format | Due | Status |
|---|
Systems Inventory (SYS)
Every system holding project data, spreadsheets included. Ranked by connector priority — the API column decides whether a connector is even possible, and the closeout column decides whether the owner keeps their data.
| Rank | System | Vendor | Category | Owned By | API | Access Ends at Closeout | Exchanges |
|---|
Ingestion Inbox
Drop any deliverable. It is checked on arrival against locatability, classification, identity and relationship rules, and itemized results come back in seconds.
Deliverable
Itemized Conformance Findings
0 findings| Severity | Rule | Entity | Finding & Remediation |
|---|---|---|---|
| Upload a deliverable to see findings. | |||
Assertion Log
| Entity | Property | Value | Source Surface | Suitability |
|---|---|---|---|---|
| Assertion log empty. | ||||
Document Register
Everything delivered, and what it is about. A document attached to nothing cannot answer a question about a room or a machine, which is the point of keeping it.
Documents
| Document | Div | Category | Filed against | About |
|---|
Documentation Coverage
What the register holds against what was delivered — in both directions. Equipment with no documents behind it, and documents for work that was never registered.
By CSI division
| Div | Expected | Components | Documents | O&M | Warranty | Gap |
|---|
COBie Readiness
COBie is the spreadsheet an owner hands to their facilities team at the end of a job. This is how much of yours could be filled in today, and what stands in the way of the rest.
The coordination models
| Model | Kind | Size |
|---|
Missing, and not on anyone's list
0COBie needs these to hand over a complete record, and nothing in your Data Exchange Map asks a contractor to provide them. So nobody is late and nobody can be chased — these stay blank until somebody is made responsible for them. Add one to a requirement and it moves to the list below, with a name against it.
| Sheet | Field | Blank on | Would come from |
|---|
Missing, and somebody owes it
0A requirement asks for these and they have not arrived. There is somebody to go back to.
| Sheet | Field | Blank on | Would come from |
|---|
Every sheet
| Sheet | Rows | Fields COBie needs | State |
|---|
Document Resolution
Which asset is this document about? Model checkers validate what is in a model and delivery trackers record that a file arrived. Neither can say which pump a warranty covers.
Work by division
| Div | Left | Progress |
|---|
Select a division
Conflict Resolution Queue
The system never decides who is right. An Information Authority declares precedence, and the superseded claims stay readable.
The Asset Record
Verified, structured data ready for operations. Outlives the appointment.